Hamworthy Heating

Madani High School, Leicester

Wessex ModuMax boilers from Hamworthy fit alongside biomass boilers to provide peak load duty assist or back up for the biomass boiler for a new build school project.

Madani High School Building

Sector: Education

Building: New build school

Products: Wessex ModuMax mk2 boiler, Powerstock glass lined calorifier

Application: Space heating 1,410kW; indirect fired domestic hot water 1,062 litres/hour


Wessex ModuMax boilers are providing the perfect back up for a biomass boiler at Madani High School in Leicester. This multi-award winning project caters for around 600 pupils and has been open since September 2007.

The two Wessex ModuMax boilers were designed and installed by Robert Prettie and Co Limited, to the performance specification set out by Pick Everard’s building services engineer, Philip Johnson, to integrate with the biomass boiler selected for the project.

He commented,

“We can always depend on Wessex ModuMax boilers because they integrate really well with the chosen biomassboilers. They also fit into a small space and deliver great efficiency. Space was tight in the plant room but Wessex ModuMax boilers can cope with the base load for the school with ease: The choice was easy.”

The boilers supply all the heating and hot water via a Hamworthy Powerstock Calorifier, and the entire system is controlled by a BMS system to ensure each room is kept at a constant temperature and monitored on site by the facilities team. The school has achieved a ‘Very Good’ BREEAM rating.

Wessex ModuMax boilers are compact floor standing boilers which offer a choice of high efficiency condensing models.

null

If you would like help making your school or university heating and hot water work more efficiently, book a free site survey or contact your local Area Sales Manager.

Partnerships

CIBSE Patron WhiteSoPHE Logo
BESA logo
ICOM

Hamworthy Heating 2025. All Rights Reserved

  • Youtube
  • Linkedin